Case history
Custom stainless-steel hatches for filtration and solid–liquid separation systems
Client context and objectives
In the industrial filtration sector, operational continuity depends on structural and closing components capable of working with controlled tolerances, mechanical loads, and variable environmental conditions. The client needed custom stainless-steel hatches, manufactured to drawing, intended for integration on a filtration and solid–liquid separation system.
The goal was to obtain a robust component, correctly sized and ready for on-site assembly, minimizing downtime and ensuring compatibility with the interfaces and constraints already present on the system.
The technical challenge
The main challenge concerned manufacturing components to geometries constrained by the drawing, with attention to:
- dimensional accuracy and consistency of measurements to guarantee on-site fit-up;
- structural strength and control of deformation during machining and handling;
- weld quality and continuity of finishes in relation to the operating environment;
- functional provisions (holes, flanges, connections) for integration with the filtration system.
It was also necessary to manage the transition from drawing to production in an orderly way, limiting the risk of non-conformities and ensuring a repeatable process.
The Crainox solution
From technical development to production
Starting from the files and design specifications, Crainox set up the manufacturing cycle, defining the cuts, bends, welds, and checks required to meet the component’s dimensions and functional requirements.
Production was managed through a structured workflow, ensuring traceability of each phase and consistency between design and manufacturing, through to delivery of components ready for installation.
Manufacturing phases
- Drawing review and engineering – verification of dimensions, constraints, and interfaces for on-site integration.
- Cutting and component preparation – execution of profiles and provisions as specified.
- Bending and assembly – forming and jigging to maintain geometries and alignments.
- Welding and inspections – execution of joints and dimensional/functional checks.
- Finishing and surface treatment – final preparation for durability and aesthetic/industrial quality.
Results for the client
The supply enabled the client to obtain components ready for installation that:
- reduce the risk of on-site rework thanks to execution accuracy;
- ensure robustness and structural stability during handling and operation;
- simplify integration with the filtration system’s existing interfaces;
- support operational continuity and faster maintenance.
Project gallery
Photographic selection of the main phases and details of the component: